18 June 2004
Up goes the back-bar shelving unit

Thanks to Bruce and Tawa for their forklift

 


18 June 2004
A dark beer is added to the range


18 June 2004
Clare paints the ceiling


25 June 2004
Aran and Weib build the shuttering for the concrete bar to be poured into


25 June 2004
Cutting the reinforcing steel rods



1 July 2004
The Concrete Bar is poured