14 May 2004
Help was drafted in to get rid of those first two firkins

A tough job, but someone's got to do it!


16 May 2004
Our pint glass with logo

(CRAC2 inside)


18 May 2004
Concrete delivered to fill in the drainage ditches


19 May 2004
The 13mm fire-line GIB goes up on the ceiling
with the help of a gas operated 'GIB lifter'


25 May 2004
The 3 brick thick walls are cut


25 May 2004
Then the steel supports are welded in

 


27 May 2004
The brewery floor is painstakingly leveled to give the correct fall


27 May 2004
Out comes another window, the quick method!
Thanks Michael!

 


28May 2004
Michael the builder opens up the third window


31 May 2004
The brewery floor is poured

 