14 May 2004
Help was drafted in to
get rid of those first two firkins
A tough job, but someone's got to do it!

16 May 2004
Our pint glass with logo
(CRAC2 inside)

18 May 2004
Concrete delivered to
fill in the drainage ditches

19 May 2004
The 13mm fire-line GIB
goes up on the ceiling
with the
help of a gas operated 'GIB lifter'

25 May 2004
The 3 brick thick walls
are cut

25 May 2004
Then the steel supports
are welded in

27 May 2004
The brewery floor is painstakingly
leveled to give the correct fall

27 May 2004
Out comes another window,
the quick method!
Thanks
Michael!

28May 2004
Michael the builder opens
up the third window

31 May 2004
The brewery floor is poured