13
December 2003
180 degree Panorama of Poplar St
Our premises coffee coloured building centre before we started

The
Council's Plans for the area
Our Premises above arrow number 2

13
March 2004
The existing partitions walls are removed
Left to right: Martin , Stephen

Miles
lends a hand

3
April 2004
The bare shell once the old internal walls have been removed

10
April 2004
Rip down old lath and plaster ceiling

5
April 2004
Stephen Sanding the floor of the (future) office

11
April 2004
The first brew in the 50 litre pilot brewery
John Timpany (Brewery fabricator and brewing guru!), Martin (Brewing Student!)

11
April 2004
Mashing in
John tips in the malted barley as Stephen (left) mixes the grist with the
hot liquor (water)

19 April 2004
Borrowing Keith's nailgun certainly speeded things up on the wall framing

18 April 2004
Phew! That's one wall finished

22 April 2004
More demolition!

26
April 2004
The casks finally arrive, and
we manage to get all 44 of them
into the trailer, in Martin's truck and on the roof rack
Don't worry, Stephen didn't have to hold them on all the way home!


27 April 2004
Next morning, and now for a quieter job, stripping the
paint off those old bricks, using acid and steam